| Photos |
Description |
 |
Roll On Loading
of Tug onto Barge, Dry Docking and subsequent Launch of Tug |
 |
Generator
lift with Four Tower Gantry System and loading on a high girder bridge
and dolly trailer |
 |
Antonov
Aircraft: Loading and Securing of Emergency Oilfield supplies |
 |
Antonov
Aircraft: Loading and Securing of Mobile Power Plants |
 |
DC-8
Aircraft: Loading and Securing of Project cargo |
 |
Ro/Ro
Ship: Loading |
 |
Discharge
of Turbine from Barge to hydraulic transporter |
 |
Discharge of over-dimensional pressure vessel from ship to hydraulic
trailer onboard Barge followed by roll-off discharge from Barge to shore |
 |
Chemical
Tanker - Survey for Tank Cleanliness and Suitability |
 |
Discharge
of Turbine from railcar by jack and slide, followed by loading on high
girder bridge transporter |
 |
Storage
Facility Suitability: both internal and external inspection of storage
facility |
 |
Project
cargo being loaded and secured on heavy lift vessel in Korea |
 |
Loading
of specialized tubing/pipe in Bremerhaven/Antwerp |
 |
Loading
Pressure Vessel in Korea |